Friday, January 3, 2014

Fall and Sheetrock at the Lake House

As Fall rolled in on Tillson Lake, we were lucky enough to have another visit from Rob's buddy Hans.



As the plumbing was finishing up, the next step was closing in the walls with sheetrock. Below grade in the workshop, we needed to put up a vapor barrier on the concrete walls, and then we could put up the sheetrock.

This picture is showing the vapor barrier on the walls

The sheetrocking begins

Er takes on the screw gun - watch out!


We then put up the sheetrock upstairs....




Gaps were left at the top of the sheetrock to insert the hose for the insulation (see next post!)